+91 77409 68143 shailendrashekhawat99@gmail.com Jain Colony, Bijainagar, Rajasthan - 305624

Interactive Estimator

Input your preliminary engineering metrics to calculate dynamic materials, machinery, and detailed BOQ estimations.

OUR COMMITMENT

Engineered to Last. Built with Responsibility.

Our structural capabilities are backed by a deep adherence to industrial excellence, safety metrics, and ecological management.

HSE Safety Leadership

Implementing active safety risk assessment cards, PPE mandates, and weekly emergency drill audits.

Quality Control Auditing

Continuous materials assessment in NABL-accredited labs for concrete strength and pipeline weld pressure.

Optimized Project Scheduling

Utilization of advanced planning models (Primavera, MS Project) to ensure target milestones are met.

Ecological Remediation

Responsible disposal of excavation silt, and trench restoration following pipeline completion.

Modern construction structure showing scale

Professional Compliances

ISO 9001
ISO 45001
ISO 14001
PROJECT WIDGET

Interactive Scope & Logistics Estimator

Input your preliminary engineering metrics below to receive basic material, machinery, and time estimations generated by our civil analytics model.

Structural Parameters
500 sq.ft. 50,000 sq.ft.
Masonry & Plaster Specs
100 sq.ft. 25,000 sq.ft.
Finishing & Coatings
AI Blueprint Vector Scanner

Upload drawing blueprints (PDF or Image formats) to dynamically auto-detect slab areas, columns schedules, and populate metrics.

Itemized Cost & Quantity Estimates

Raw Structure Focus Local Engine
Concrete Structure Cost ₹0 0 m³ Concrete
Wall Masonry Cost ₹0 0 Bricks
Plastering Cost ₹0 0 sq.ft. Area
Finishing Works Cost ₹0 0 sq.ft. Area

Auto-Generate BOQ Billing

Click here to instantly print / download your itemized BOQ billing sheet.

High-Level Project Cost Summary
Civil Works Subtotal: ₹0
Contractor Overhead & Mobilization (5%): ₹0
GST / Tax Surcharge (18%): ₹0
Grand Total (All-Inclusive): ₹0
Estimated Materials Bill (RCC + Masonry)
Cement (Grade 43/53) 0 Bags
Reinforcement Steel (TMT Fe-500/550) 0.0 Tons
Sand / Fine Aggregate 0 cft
Coarse Aggregate (10mm/20mm) 0 cft
Masonry Bricks / Blocks 0 Nos

Estimated material quantities include standard conversion compaction factors (1.54 for concrete, 1.33 for plaster mortar) and 5% wastage allowance. Heavy civil contracts require geo-technical auditing to finalise rates.

Request Commercial RFP Document
GET IN TOUCH

Partner With Prem Infra Projects

Let's collaborate on your next construction project. Reach out to our procurement office directly or submit a project brief using the RFP submission form.

Headquarters Office

Jain Colony, Nearby 27 Mill, Bijainagar, Beawar, Rajasthan - 305624

Direct Bid Tendering

shailendrashekhawat99@gmail.com

Telephonic Helpline

+91 77409 68143 (Office Head)

Request Commercial RFP or Quote

Fill in details for a prompt reply from our business development engineers.

Name is required
Company name is required
Enter a valid corporate email
Enter a valid mobile or office number
Scope details are required
You must accept our data guidelines